    1 = Scheduling Tools
     1[[PageOutline(2-5,Contents,pullout)]]
     2
     3= Scheduling Trac tickets
    24
    35== Description
     
    911This plugin is a scheduling algorithm for Trac tickets. If each ticket is assigned an effort, they can be scheduled based on their owner and priority and milestone. Then a Gantt chart can be generated.
    1012
    11 It displays all scheduled tickets as usual together with their milestones. The latter ones are display in black if the milestone due date is met, or in red otherwise.
     13It displays all scheduled tickets as usual together with their milestones. The latter ones are displayed in black if the milestone due date is met, or in red otherwise.
    1214
    1315Scheduling is influenced by:
     
    1719A personal time table displays the next tickets a developer should work at:
    1820
    19 [[Image(gantt.gif)]]
     21[[Image(gantt.gif, border=2)]]
    2022
    2123Team avalabilities can be maintained:
    2224
    23 [[Image(timetable.gif)]]
     25[[Image(timetable.gif, border=2)]]
    2426
    25 Works with the EstimationToolsPlugin:
     27This plugin also works in combination with the EstimationToolsPlugin:
    2628
    27 [[Image(avail.gif)]]
     29[[Image(avail.gif, border=2)]]
    2830
    2931== Bugs/Feature Requests